A huge share of the country's national capital is always spent in the form of building residential, commercial, administrative, educational and cultural units. Therefore, the proper efficiency of the national wealth, compliance with the rules in design, supervision and implementation, along with the use of standard materials and expert human resources, are very important.
The role of supervising engineers as persons who must master all the technical and legal matters of construction and guarantee its correct implementation is very important due to the high costs of construction and the heavy cost of fines resulting from not applying the correct principles of supervision. Is. In this course, we decided to provide practical and important information about common problems in concrete and metal buildings, which is the result of past experiences, in order to increase the technical and legal knowledge of engineers and in general all those who work in the field of construction. , to teach in the form of real images and simple and practical expression.
We must know that building supervision is a multi-faceted matter and supervising engineers must also have relative knowledge in the field of design, which they acquire relative knowledge almost during their studies at the university, but the main problem here is that generally supervising engineers during the university period They don't deal with executive matters and they rarely get a chance to get acquainted with them, and when they step into the field of this field in a real project as a person who must be responsible for the quality of building implementation, they face many challenges. and in many cases, due to the executive nature of the projects and the insistence of the building owners on the quick implementation of the project, the young supervising engineer, when dealing with a problem, does not have enough time to ask the competent authorities and make a timely decision, and this is the same issue. It can cause him trouble.
In this course, many of the needs of supervising and executive engineers to know the cases that are considered violations and also the correct way to deal with these violations are solved.
The list of topics and outlines presented in this educational series is as follows: Lesson 1: Control of monitoring criteria at the start of executive operations, excavation and foundation - Part 1 The importance and concept of monitoring based on an executive fault Definition of surveillance Compliance items at the time of building construction Definition of observer Interpretation of Note 7, Article 100 of the Municipalities Law Competent executor Building density control according to the issued permit Building permit control before starting construction The course of legal procedures for the construction of a new building Building permit details Controllers of the engineering system organization Licensing authorities Visiting the project site How to deal with the discrepancy between the building permit and executive plans Writing a violation report in dealing with additional construction in the foundation phase The supervisor's correspondence with the architectural designer References addressed in the violation report of supervising engineers The foundation of the adjacent building The responsibility of the supervisor and executive in the lack of accuracy in compliance with the license and executive plans Expiration times that are important but not mentioned in the license Inspector's report at the end of the validity of the incomplete building permit Deduction of the new supervisor's quota after the end
Company | شرکت مهندسی ساخت فراز کاچار |
---|---|
Tel | +98 21-2×××3043 |
Mobile | +98 912×××1594 |
Whatsapp link | |
Instagram page | |
Website | https://www.safakaco.com/ |
Country | Iran |
Province | Tehran |
Address | تهران- سعادت آباد-انتهای بلوار فرحزادی بالاتر از بزرگراه یادگار امام- خیابان ایثارگران شمالی- پلاک 16 طبقه دوم - واحد 7 |