## Power plant installation and commissioning (dispersed generation generators)\r\n\r\nWith a doctorate in electrical engineering, I have enough experience in the field of installing and operating gas (GAS Engine-Turbine), wind and solar power plants, as well as obtaining permits for DG power plants, both fossil and new energy.\r\n\r\n### Power plant connection plan to the grid (studies of connection to the grid of solar and renewable gas power plants)\r\n\r\nA number of previous experiences in the field of carrying out the grid connection plan: studies of the connection plan to the electricity grid and Satba and the permit to connect to the grid of the 2 MW DG Behnoush power plant to the distribution network of Greater Tehran - the plan to connect to the power grid and the permit to connect to the grid of the 25 MW Mapna power plant CHP desalination plant to Kangan-Fars substation, power grid connection plan and power grid connection permit 16 MW DG Dewar Nirobarq Khuzestan power grid connection permit and power grid connection plan 25 MW Solar Photovoltaic Solar Vandad Saman Pars Regional Electricity of Sistano and Satba - connection plan to the electricity grid and connection permit to the grid 25 MW Solar Photovoltaic (PV) power plant of Vandad Saman Pars Fars Regional Electricity and Satba - connection plan to the electricity grid and connection permit to Ashtian 50 MW wind power plant network, to Bakhtero Satba regional electricity - connection plan to the power grid and permission to connect to the grid and study of the 25 power plant connection plan solar megawatt solar photovoltaic \"Atlas Energy of Eastern Mina Qeshm\" to the power grid of Hormozgan and Satba region and the studies of the connection plan to the power grid and the permission to connect to the 10 megawatt DG power plant network, distributed production of Abtiaj\'s agenda to the regional power grid of Tehran and the connection plan to the power grid and The permission to connect to the 500 kW solar photovoltaic power plant of Mr. Abdi to the electricity distribution network of Khorasan Satba and the connection plan to the power grid and the permission to connect to the solar power plant network Photovoltaic PV Mehrtab Qeshm with rotating panel and solar inverter connected to the Huavi network to the distribution of Yazd and Satba - plan to connect to the electricity network and connect to the network of the 4 megawatt solar photovoltaic power plant of Gam Sabze Arak to the electricity distribution network of Arak and Satba\r\n\r\n**I have a lot of experience in the field of installation and commissioning and preparation of the main documents of the power plant such as wiring diagram, P&I Diagram, process diagram and other maps such as layout, protection and measurement maps.**\r\n\r\nSome of my experiences in the field of installation and operation include the 8 MW ITCO power plant in Isfahan, the 15 MW Khavar Pars power plant in Shiraz, the 1 MW Mahnavi power plant in Qom, etc.\r\n\r\n### Power plant design by PV Sys\r\n\r\nincluding technical and economic issues and the number of strings and series cells, DC inputs, radiation intensity and panel temperature, panel efficiency considering the shadow and hotspot effects of the panels, PID and LID calculation and physical design of the solar power plant, the type of grounding of the panels and inverters Solar panel structure design standard, two-axis tracker panel\r\n\r\n### Description of services in the field of small scale gas generators:\r\n\r\n**1. Holding briefing sessions and defending the plan and obtaining a construction agreement**\r\n**2. Obtaining hair permits
Tehran