Lovato capacitor regulator 5 steps

  • View: 82
  • updated: 15 Hour ago
  • Expire: Tuesday 15 Sep 2026
  • Last Login : 4 Hour ago
Contact with the company Start order
  • Gold
  • 8 Year

Lovato capacitor regulator 5 steps


[Lovato capacitor regulator 5 steps](https://www.automation24.ir/product-2013/%D8%B1%DA%AF%D9%84%D8%A7%D8%AA%D9%88%D8 %B1-%D8%AE%D8%A7%D8%B2%D9%86%DB%8C-%D9%84%D9%88%D8%A7%D8%AA%D9%88-5-%D9% 25BE%D9%84%D9%87)


### Regulator

The regulator is a device that, by measuring the power factor of the load, adds the required amount of capacitor to the circuit. In fact, this device detects how much capacitor should be connected to the circuit in order to obtain the desired power factor.

### Working principles of the regulator:

Step 1) Measurement of active and reactive power

Step 2) Calculate the power factor using the relationship COSQ=P/PS

Step 3) Calculate the reactive power required to reach the desired power factor

Step 4) injecting reactive Q kilovar into the circuit

Q = P (tan p1 - tan (2Q = P( tan Ꝕ1 –tan2 )
P = amount of contracted power in kilowatts
tanꝔ1= current power factor
tanꝔ2= desired power factor
Ꝕ=required reactive power







Click to view Lovato Incha products.









Capacitive regulators are divided into two categories, smart and simple. The number of steps in the structure of the regulator indicates the number of capacitors needed to correct the power factor, which is available in the market from 4 to 12 steps.



## Important points in adjusting the capacitor bank network regulator

1: The voltage intended for the regulator by the manufacturer should be the same as the mains voltage.

2: The current transformer to feed the regulator must be placed in the main power input to measure both the capacitor current and the load current.

3: The value of C/K should not be greater than the set value, otherwise the error rate will increase.

4: The value of C/k should not be lower than the set value, otherwise the error rate will decrease, but there is a possibility of fluctuation (switching on and off) of one step.


Q: The capacity of the smallest stage of the capacitor bank in terms of VARA reactive volts
C/K=Q/(√3.V.K1.K2)
√3.V.K1.K2
V: Mains voltage

K1: Current transformer conversion ratio

K2: Transformer voltage conversion ratio

Automation site 24

  • Gold Company
  • Company registration date: -
  • Number of staff: 1-10 Person
  • Company activities: Agents, Distributor and Wholesaler, Shop
  • Place: Iran, Province Qom
  • In the field of: Industrial electricity
  • Company Type: Private

Automation 24 online store based on a store with 30 years of experience and electricity activity Industrial, industrial automation and measuring instruments and equipment were launched in March of 1993. With the activities carried out, this store has the friendly symbol of electronic trust from the Ministry of Industry, Mines and Trade, the golden symbol of organizing Internet sites by the Ministry of Culture and Islamic Guidance, and also under the supervision of FATA police review systems and the Center for Information Technology and Digital Media. It is necessary to mention that purchasing from the site of 24 Automation Store according to the incentive plan, which has been active from the beginning of this store, is free of charge through Pishtaz post and without any cost for buyers to the address listed (door of the house). Or workplace) will be sent.
Industrial electricity

Contact Info
Companyسایت اتوماسیون 24
Tel +98 25-3×××5444, +98 25-3×××3444 callMake Call
Mobile +98 910×××6576 callMake Call
Whatsapp Whatsapp link
Telegram Telegram link
Website http://www.automation24.ir
CountryIran
ProvinceQom
Addressقم -میدان امام خمینی- بلوار شهید بهشتی - پلاک 67 - فروشگاه اینترنتی اتوماسیون 24
Send pm Company Profile
FAQs

Do you have any question about this product?

The latest products in this category