Introduction تمام electrical equipment of power plant such as generator and motor, and the panels have to breakdown about the test and review The بگیند., the major tests required in the list below have been brought.
1-generator and system stimulation 1-1-resistance test .. game, play online 1-2-Test insulation resistance Tester(test from) 1-3-test surge 1-4-test Pat
2 - equipment and installations هدف from this test to ensure correct operation of other equipment and installations existing in the system. In this test, many parts of the system that there is a defect in any one of them could be the performance of the whole system and affect are investigated. 2-1 - system ground
2-3 - main transformer
control the status of the establishment of the foundations or rails
visit the apparent, and ensure the correctness of the installed hardware and the status of the fit of all parts
ensure there is a direct connection to the hull with the earth grid, or insulation being a body for the use of TANK PROTECTION
Test insulation resistance tester with, unless
measure the conversion ratio in all تبها
the measurement determining the best operation in pulse, the main
the measurement of the flow بیباری in all تبها and the level of ولتاژها
Test دیالکتریک oil
measure resistance .. game, play online سیمپیچها in all تبها
test if a stream بوشینگی, including the conversion ratio, control polarity., the insulation resistance Tester and the saturation curve
Performance Test manual and mechanical تبچنجر, including اینترلاکها and نشاندهندهها
test the performance of electric تبچنجر, including اینترلاکها and نشاندهندهها
test performance تبچنجرهای parallel, including اینترلاکها and نشاندهندهها
measuring impedance in tabs different
Test insulation resistance Tester circuits control and auxiliary with The except
Test control boards in terms of performance, hardware and سیمبندی
test boards auxiliary in terms of performance, hardware, etc. protections and سیمبندی
test if a stream بوشینگی, including the conversion ratio, control polarity., the insulation resistance Tester and the saturation curve
test performance تابلوههای auxiliary and control
Performance test equipment, instrumentation, and کالیبرهنمودن they include نشاندهندهها, etc. measurement devices and protective equipment
test performance بوخهلز
test the performance of valves, etc. controls the status of the plumbing and controls the status of the expansion tank
control the situation خشککننده forecast( silica gel)
control the situation بوشینگها
control the short-circuit secondary Transformers stream بوشینگی that are the circuit and a short circuit being the secondary Transformers stream بوشینگی that in the circuit are not.
control the correct connection, and mana ...
Company | شرکت اهرام فناوری آذرخش |
---|---|
Tel | +98 21-0×××6717215 |
Mobile | +98 912×××7215 |
Whatsapp link | |
Instagram page | |
Website | http://www.dgsolar.ir |
Country | Iran |
Province | Tehran |
Address | خ ستارخان روبروی برق الستوم-پلاک 790 |