The process of implementing ceiling steel deck بایرایـرانیان
The process of implementing سقـف this period is that after the design of the roof and determine the فـواصل beams sub -
Map, coffee shop the direction of insertion, the plates on the openings of different preparation and recipe production to plant data.
After producing, etc. the pages are packed by machines, intelligent times to the project site, and send to the device جرثقـیل or Tower based on the workshop on اسـکلت in scales different سقـف is to be placed.
Then صفـحات on the beams, according to the map پخـش and by پرچهای مخصـوص in place ثـابت.
-In the next step, stud (برشگیر) of the wing bridges and beams, the sub can be installed. Install گلمیخ by the device takes place. Considering that this برشگی drop plays an important role in the safety سقـف during might encourage and when the earthquake roles
In the selection of stud must be carefully cuff into place, and also install the stud should be done by expert people.
-After installing the گلمیخ آرماتورهای heat required ceiling as a grid mesh, the armature closed, and the sheyang around the installation and the roof ready for concrete planning is www.bayeriranian.com
– Then concrete with ground pump on the roof, prepare the concrete by the group of concrete on the roof.
It should be noted, the thickness of the concrete on the highest level of the sheet should not be less than ۵۰ mm.
It should be noted it is given that the steel plates form the roof have formed therefore, the SAP of the concrete after the concrete perfectly preserved, وبتن roof in ideal conditions, more action comes into resistance better.
Benefits of roof steel deck
۱ - high speed performance ۱۱ times faster than the ceilings of other
۲ - بازگـشت quick capital
۳ - کاهـش beams ancillary to the least – ۲۰ تا ۳۰% saving in steel consumption اسـکلت structures
۴ - ۱۵ to ۲۰ percent saving in the consumption of concrete سقـف
۵ - reduce the weight of the roof structure, Foundation, and in نهـایت reduce the weight of the structure
(The weight of dead load this پروفیـل with ۸ cm volume of concrete procedural ۲۱۰ kg / sq. m. حـالی that the weight of the roof کامپـوزیت سنـتی with the same technical characteristics ۲۷۰ kg and ceilings joists, block ۳۶۰ kg.)
۴۰% lighter than the ceiling joists, block, and %۲۲% lighter than the roof, the composite traditional
۶ - appropriate performance against earthquake (increase صلبیت building) and resistance against lateral forces
۷ - the possibility of implementation and operation of concreting all the roof of the building at a time
۸ - easy passage وسالم تاسـسات from under the roof as well as repair وتعـویض very comfortable items damaged
۹ - a significant reduction هزینـه current کـارگاه
۱۰ - provisioning rebar tensile roof – ۶۰% ۷۰% % save in the consumption of rebar
۱۱ - legal platform of steel with high safety at the time of the implementation of the ceiling
۱۲ - کاهـش thickness سقـف in the افزایـش the height of the useful classes
۱۳ - ایجادسطحی monotone under the roof www.bayeriranian.com
۱۴ - انعطـاف pussies with any type of design in terms of architecture وکاربری structures
۱۵ - امـکان run on any type of سـازه metal
۱۶ - no need to شـمعگذاری around
۱۷ - قابلـیت run in a variety of conditions مـحیطی and water and air
۱۸ - remove عمـلیات کفـراژبندی and دکفراژ
۱۹ - اجـرای unobstructed duct and رایزاها comply with architectural drawings
۲۰ - carry go and requires minimum space for دپـو and نگـهداری
۲۱ - high accuracy and reliable کـنترل on the run