There are no comments for this product
The cement plug, and stripper
Button plug
Top plug
تهیه and pumping cement in the well, the oil سیمانکاری oil well or cementing to say. Operation سیمانکاری oil well to منظورهای different is done:
– for leakage, sealing the space between the casing or lining has been pushed in the well (casing or liner) and the formation of drilling he has been to this space, called the annulus, say.
– to block the area of the formation while drilling in the area, etc. هرزروی drilling mud that happens to this area called the lost circulation zone, say.
– to put a area hard and sturdy that the same plug cement (cement plug) is to deviate the well. This means that, by putting the multi-meter cement slurry in the well and after closing and hardening it, with the tool drilling deviation (directional tools), the well at the point specified gets distracted. It should be noted that the point that is well it fit distracting or be tilted (KOP), etc. should be hard enough and firm is doing this by putting a plug of cement or a piece of metal (whipstock) will be possible. It should be noted that these vital parts and required essential industries drilling oil and gas wells that have been severely affected by the sanctions are, therefore, engineering company رابرکاران Corp, with the acquisition of technical knowledge and indigenization of the production of these parts, the monopoly of foreign countries in this field, the broken, and the step height in the self-sufficiency of the country in the elimination of the need for external sample of these parts is removed
Company | شرکت فنی مهندسی رابرکاران پارسیان |
---|---|
Tel | +98 31-3×××0988 |
Mobile | +98 913×××3592 |
Whatsapp link | |
Website | http://rubberkaran.com |
Country | Iran |
Province | Esfahan |
Address | اصفهان - شهرک صنعتی امیرکبیر-بلوار عطاالملک-چهارراه کارآفرینان -جنب بلوک 29- پلاک7 |